
New decks
New decks, from a small landing off the back door to a raised deck with steps and rails. We handle the whole job: pulling out the old one, setting the piles and framing, laying the boards and finishing the edges and stairs.

Book in your free site measure and quote
Same day response
Get your free quoteA ground level deck, sometimes called a low level deck or a floating deck, sits close to the ground instead of being held up high on posts. It is the most common deck we build in Palmerston North, because so many sections in Kelvin Grove, Hokowhitu, Awapuni and Feilding are flat and the back door is only a step or two above the lawn.
Because they are low, ground-level decks usually do not need a balustrade or a building consent, which makes them the most affordable way to add outdoor living space.
Pick the boards: treated pine, kwila and hardwood or composite. On very low decks, composite boards need the ventilation gaps their manufacturer specifies.
Photos from our recent jobs. Tap any photo to see it bigger, then swipe through.
We talk through the options on site and show you examples before you decide.
A true floating deck is free-standing: it sits on its own piles and is not fixed to the house. That keeps water away from the house wall and avoids fixing into the cladding. A ground-level deck can also be fixed to the house where that suits the layout better.
The biggest risk with a low deck is moisture. A deck boxed in tight against damp ground with no airflow underneath is hard on the framing. We leave ventilation gaps, use H4 piles in the ground and H3.2 framing, and set the levels so water drains away from the house.
The deck surface has to sit below the floor level and keep the right clearance from cladding so water does not splash or wick into the wall. On some houses that limits how close to the door threshold the deck can be. We set this out before we start.
Building a deck over concrete in NZ, usually an old patio, is a common way to refresh a tired patio. It can work well with a low-profile frame on packers or pads, as long as the concrete drains, the frame stays ventilated and the finished height is right against the house. Where the slab is cracked or holds water, it is sometimes better to remove it first. We will look at it with you.
Low decks are the simplest decks to build, and the final price still depends on a few things. Costs are always subject to change, and many factors affect the final price.
Treated pine, kwila and composite price differently, and the boards are a big part of the total. We bring samples so you can decide before you commit.
A low ground-level deck is simpler than a raised deck. Height changes the piles, posts and framing, and anything where someone could fall one metre or more needs a balustrade.
Slope, soil and how easily we can get materials to the site all change the labour.
Stairs, handrails, screening, seating and removing an old deck are listed as their own lines in the written quote, so you can see each one.
Every one of these factors changes from property to property, so a price over the phone is a guess. We come out, measure up and give you a fixed written price within 48 hours. See our deck cost guide for more.
Estimate only. Costs are always subject to change and many factors affect the final price. Contact us for an accurate written quote.
We had a large fencing job done, and we couldn’t be happier with the result. The workmanship was excellent, the fence looks fantastic, and the attention to detail really shows. The whole process was professional from start to finish, with the job completed to a very high standard. It’s clear that pride was taken in the work, and the finished result has made a huge difference to the property. We would have no hesitation in recommending Rowdy Builders to anyone looking for a reliable, professional fence builder. Brilliant job and an excellent result.
We couldn’t be happier with the work from Guy at Rowdy Builders. From start to finish, he was friendly, professional and incredibly organised. He coordinated all aspects of the work, including arranging the additional trades required, and kept us well informed throughout the entire process. Everything was handled smoothly and professionally, and the end result was fantastic. We would highly recommend Rowdy Builders to anyone looking for quality workmanship and an stress-free experience
We recently had Guy and his ream construct a roof over the deck of our new house. He was pleasant and punctual on the site visit and made a number of suggestions on how it could be achieved. His quote was very reasonable and his timeline was stuck to. We are very happy with the result and recommend him to anyone looking for a similar job.
We recently engaged Guy from Rowdy Builders to repair a wooden fence blown over in strong winds, and construct a medium size deck at our property. From the outset, Guy was professional, approachable, and communicated extremely well, keeping us updated on progress and ensuring we knew what to expect at each stage of the project. The quality of workmanship was outstanding. The fence repairs were completed to a high standard, and the new deck has completely transformed our outdoor area. It is clear that Guy takes pride in his work and pays attention to detail, delivering a finished product that exceeded our expectations. We are extremely pleased with the result and would not hesitate to recommend Guy and Rowdy Builders to anyone looking for reliable, skilled tradespeople who deliver what they promise.
Wow! It’s sooooo good to have a builder that makes a big project seem so simple and straightforward. Getting 3 fences replaced was a big task but Guy was incredible and took all our worries away. He coordinated with our neighbours, planned dates that suited us all, and delivered well beyond our expectations. Prompt, diligent, professional and courteous. Guy was a pleasure to deal with and we happily give him our HIGHEST recommendation. The quality of his workmanship is amazing!
We keep it simple. Three things built well, a small team you can actually get hold of, and a price that stacks up against anyone else in town.
The quote lists the timber, the sizes and what is included, so there are no surprises.
Small team by choice. Whoever measures your job is the one on the tools building it.
Posts go deeper on exposed sites, and boards are spaced so water drains instead of sitting.
If something we built is not right, we come back and put it right.
You deal with the same person from the first enquiry to the final walk-through. No call centres, no runaround.
Fill in the quote form. Tell us roughly what you are after and where you are.
We come to your place, measure up, check access and talk through timber and layout options with you.
You get a written price within 48 hours of us being on site, with what is included spelled out.
Old structure out, posts and piles in, then framing, boards and rails. We let you know what is happening each day.
We clear the offcuts and old material, tidy the site and walk the finished job with you before we leave.

Most regrets come from the same handful of mistakes. Here is what goes wrong, and how we prevent it.
A deck boxed in tight against damp ground with no airflow underneath, which is hard on the framing.
We leave ventilation gaps and use H4 piles in the ground and H3.2 framing.
Water splashing or wicking into the house wall.
We keep the right clearance from cladding and set levels so water drains away from the house.
A deck surface that sits too close to the door threshold.
We set out the finished height against the house before we start.
A deck built over a cracked or water-holding slab.
We look at the concrete with you, and sometimes it is better to remove it first.
Composite boards on a very low deck with no ventilation.
We leave the ventilation gaps their manufacturer specifies.
Every job starts the same way: we come out, measure up, talk through timber and layout, and leave you a fixed written price.

New decks, from a small landing off the back door to a raised deck with steps and rails. We handle the whole job: pulling out the old one, setting the piles and framing, laying the boards and finishing the edges and stairs.

Low-maintenance composite decking: no oiling, no staining, no splinters. We build the frame to suit composite, with closer joist spacing, proper expansion gaps and ventilation underneath.

Kwila, vitex and garapa timber decks with fixings that will not stain the boards. Hardwood is the choice when you want a deck that looks premium and wears hard.

A roof or pergola over the deck so you can use it in Manawatū rain and sun. Fixed into the house structure and built to handle the wind.

New fences and replacements, boundary or internal. A fence stands or falls on how the posts go in and whether the line is set before the rails go on, so that is where we spend the time.

Pergolas over decks, patios and entranceways, built and fixed so they handle Manawatū wind. We set them out around how you actually use the space and how the sun tracks across it.

Ground-level decks are the most common deck we build around Palmerston North, because so many sections are flat.
Rowdy Builders is a small Palmerston North building company run by Guy, who was born and raised here. We build decks, fences and pergolas, and we have been doing it for over ten years across Palmerston North, Feilding and the surrounding Manawatū.
A floating deck is a low, free-standing deck that sits on its own piles close to the ground and is not fixed to the house. It is a simple, affordable way to add outdoor space.
Usually not. Decks where nobody could fall more than 1.5 metres are generally exempt, though they must still meet the Building Code.
Often, yes, using a low-profile frame on packers or pads, as long as the slab drains and the frame stays ventilated. If the slab is cracked or holds water, removing it may be better.
Low enough to step onto easily, but it still needs airflow underneath and the right clearance from the house cladding. We set the height to suit both.
Not if the fall is less than one metre, which covers almost all ground-level decks.
Yes, fully insured on every job. We are happy to send the details through with your quote if you want them.
Palmerston North, Feilding and the surrounding Manawatū, including Ashhurst, Aokautere, Kelvin Grove and Hokowhitu. If you are not sure whether you are in our patch, send us the form and ask.
Yes. Pulling out the old one and carting it away is part of the job, and it is covered in the price we quote you.
Some decks need it and plenty do not. Generally, a deck needs consent if someone could fall more than 1.5 metres from it. We will tell you where your job sits when we come out. Read the deck consent guide.
Yes. A short fence run, a small landing or a single pergola is fine. Give us a call and we will come and price it.
From Hokowhitu to Aokautere, out to Ashhurst, Bunnythorpe, Longburn and Linton, and across to Feilding and the wider Manawatū. We come out to quote for free.
Same day response
Get your free quote