
New decks
New decks, from a small landing off the back door to a raised deck with steps and rails. We handle the whole job: pulling out the old one, setting the piles and framing, laying the boards and finishing the edges and stairs.

Book in your free site measure and quote
Same day response
Get your free quotePlenty of Palmerston North homes do not have a flat back yard. Out towards Aokautere and Summerhill, and on the terraces above the river, a lot of sections fall away from the house. The ranch slider might be at ground level at one end and well above it at the other. A raised deck turns that awkward drop into the most-used space at the house.
Raised and multi-level decks are where the building side matters most. Pile depth, bracing, post sizes, stair design and balustrades all have to be right, and some decks will need a building consent. We have built decks on sloping sections for over ten years and we will tell you what your site needs before you spend anything.
Deck extensions. A deck extension adds onto an existing deck, or extends living space out from the house where there was only a small landing. If the existing deck is sound and built to a standard we are happy to tie into, an extension can be cheaper than starting again. If it is not, we will tell you, and a replacement is usually the better spend.
Deck off house doors. Most raised decks are built off the house, at the level of a ranch slider or French doors. The deck is fixed to the house with a stringer, set out with the right spacers and flashings so water cannot track into the wall, and supported on piles at the outer edge.
Cantilever decks. A cantilever deck has joists that extend past the last bearer, so the outer edge seems to float with no posts underneath. It works for modest overhangs and gives a clean look on a slope, but the overhang is limited by the timber sizes and has to be designed for the load. We will tell you what is realistic for your site.
Second-storey and high decks. Second-storey decks and high decks need the most care: deep piles, heavy bracing, a compliant balustrade and almost always a building consent. See our balustrades and deck stairs pages, and the deck consent guide.
Under Schedule 1 of the Building Act, a deck is generally exempt from building consent if nobody could fall more than 1.5 metres from it, even if it collapsed. Above that, you will normally need a consent from the council. On a sloping section the fall height is measured from the deck to the ground below, which is not always the same as the deck's height at the house end.
Even an exempt deck still has to comply with the Building Code, including a barrier where the fall is one metre or more. District plan rules, like boundary setbacks, can also apply. We will tell you where your deck sits when we measure up. Read our full guide to deck consent in Palmerston North.
Designing the deck as two or three lower levels can sometimes keep a project under the consent threshold and bring the cost down. It does not suit every site, but it is always worth looking at.
Balustrades. Under the Building Code, a barrier is needed wherever someone could fall one metre or more. We build balustrades in timber, powder-coated aluminium or frameless glass, to the height and spacing the code requires, so small children cannot climb or squeeze through.
Photos from our recent jobs. Tap any photo to see it bigger, then swipe through.
We talk through the options on site and show you examples before you decide.
The finished height is usually set by the door threshold. From there we work out how far the ground drops across the deck footprint, which decides pile depths, post heights and how many steps you need to get down to the lawn.
Taller decks need deeper piles and bracing so the deck does not sway or rack. On a slope, the downhill piles can be much taller than the uphill ones, and the bracing has to account for that. This is the part that makes a high deck feel as solid as a low one.
Rather than one big platform held high off the ground, a multi-level deck steps down the slope. It is often cheaper than one high deck, because each level is lower. It also breaks the space into areas, like a dining level by the house and a lounging level further out, and keeps more of the deck under the 1.5 metre fall height that usually triggers a building consent.
Stairs are built with consistent rises and goings so nobody trips on an odd step, and with handrails where they are needed. We will plan where the stairs land so they come down somewhere useful, not into a garden bed.
Raised decks cost more per square metre than the same deck at ground level, because of the taller posts, deeper piles, bracing, stairs and balustrade. Costs are always subject to change, and many factors affect the final price.
Treated pine, kwila and composite price differently, and the boards are a big part of the total. We bring samples so you can decide before you commit.
A low ground-level deck is simpler than a raised deck. Height changes the piles, posts and framing, and anything where someone could fall one metre or more needs a balustrade.
Slope, soil and how easily we can get materials to the site all change the labour.
Stairs, handrails, screening, seating and removing an old deck are listed as their own lines in the written quote, so you can see each one.
Every one of these factors changes from property to property, so a price over the phone is a guess. We come out, measure up and give you a fixed written price within 48 hours. See our deck cost guide for more.
Estimate only. Costs are always subject to change and many factors affect the final price. Contact us for an accurate written quote.
We had a large fencing job done, and we couldn’t be happier with the result. The workmanship was excellent, the fence looks fantastic, and the attention to detail really shows. The whole process was professional from start to finish, with the job completed to a very high standard. It’s clear that pride was taken in the work, and the finished result has made a huge difference to the property. We would have no hesitation in recommending Rowdy Builders to anyone looking for a reliable, professional fence builder. Brilliant job and an excellent result.
We couldn’t be happier with the work from Guy at Rowdy Builders. From start to finish, he was friendly, professional and incredibly organised. He coordinated all aspects of the work, including arranging the additional trades required, and kept us well informed throughout the entire process. Everything was handled smoothly and professionally, and the end result was fantastic. We would highly recommend Rowdy Builders to anyone looking for quality workmanship and an stress-free experience
We recently had Guy and his ream construct a roof over the deck of our new house. He was pleasant and punctual on the site visit and made a number of suggestions on how it could be achieved. His quote was very reasonable and his timeline was stuck to. We are very happy with the result and recommend him to anyone looking for a similar job.
We recently engaged Guy from Rowdy Builders to repair a wooden fence blown over in strong winds, and construct a medium size deck at our property. From the outset, Guy was professional, approachable, and communicated extremely well, keeping us updated on progress and ensuring we knew what to expect at each stage of the project. The quality of workmanship was outstanding. The fence repairs were completed to a high standard, and the new deck has completely transformed our outdoor area. It is clear that Guy takes pride in his work and pays attention to detail, delivering a finished product that exceeded our expectations. We are extremely pleased with the result and would not hesitate to recommend Guy and Rowdy Builders to anyone looking for reliable, skilled tradespeople who deliver what they promise.
Wow! It’s sooooo good to have a builder that makes a big project seem so simple and straightforward. Getting 3 fences replaced was a big task but Guy was incredible and took all our worries away. He coordinated with our neighbours, planned dates that suited us all, and delivered well beyond our expectations. Prompt, diligent, professional and courteous. Guy was a pleasure to deal with and we happily give him our HIGHEST recommendation. The quality of his workmanship is amazing!
We keep it simple. Three things built well, a small team you can actually get hold of, and a price that stacks up against anyone else in town.
The quote lists the timber, the sizes and what is included, so there are no surprises.
Small team by choice. Whoever measures your job is the one on the tools building it.
Posts go deeper on exposed sites, and boards are spaced so water drains instead of sitting.
If something we built is not right, we come back and put it right.
You deal with the same person from the first enquiry to the final walk-through. No call centres, no runaround.
Fill in the quote form. Tell us roughly what you are after and where you are.
We come to your place, measure up, check access and talk through timber and layout options with you.
You get a written price within 48 hours of us being on site, with what is included spelled out.
Old structure out, posts and piles in, then framing, boards and rails. We let you know what is happening each day.
We clear the offcuts and old material, tidy the site and walk the finished job with you before we leave.

Most regrets come from the same handful of mistakes. Here is what goes wrong, and how we prevent it.
Shallow piles and no bracing, so a tall deck sways or racks.
Taller decks get deeper piles and bracing, with the downhill piles accounted for on a slope.
Finished height set without checking how far the ground drops.
We set the levels from the door threshold, then work out pile depths, post heights and steps.
Stairs with uneven rises that people trip on.
We build stairs with consistent rises and goings, and plan where they land.
No barrier where someone could fall one metre or more.
We build balustrades in timber, powder-coated aluminium or frameless glass to the height and spacing the code requires.
A deck that needed building consent and did not get it.
We tell you where your deck sits when we measure up. Generally consent is needed if someone could fall more than 1.5 metres.
Every job starts the same way: we come out, measure up, talk through timber and layout, and leave you a fixed written price.

New decks, from a small landing off the back door to a raised deck with steps and rails. We handle the whole job: pulling out the old one, setting the piles and framing, laying the boards and finishing the edges and stairs.

Low-maintenance composite decking: no oiling, no staining, no splinters. We build the frame to suit composite, with closer joist spacing, proper expansion gaps and ventilation underneath.

Kwila, vitex and garapa timber decks with fixings that will not stain the boards. Hardwood is the choice when you want a deck that looks premium and wears hard.

A roof or pergola over the deck so you can use it in Manawatū rain and sun. Fixed into the house structure and built to handle the wind.

New fences and replacements, boundary or internal. A fence stands or falls on how the posts go in and whether the line is set before the rails go on, so that is where we spend the time.

Pergolas over decks, patios and entranceways, built and fixed so they handle Manawatū wind. We set them out around how you actually use the space and how the sun tracks across it.

Raised and multi-level decks are where the building side matters most, and we have built decks on sloping sections for over ten years.
Rowdy Builders is a small Palmerston North building company run by Guy, who was born and raised here. We build decks, fences and pergolas, and we have been doing it for over ten years across Palmerston North, Feilding and the surrounding Manawatū.
Generally, if someone could fall more than 1.5 metres from the deck, it needs a building consent. Below that it is usually exempt, but still has to meet the Building Code. We will tell you which side of the line your deck falls on before you commit.
The Building Code requires a barrier wherever someone could fall one metre or more. We build them in timber, aluminium or glass to the code's height and gap requirements.
Yes. Steep sites mean taller posts, deeper piles and more bracing, and sometimes a multi-level design works out better than one high platform. We will look at the site and give you options.
Not necessarily. Several lower levels can cost less than one tall deck because the posts are shorter and less bracing is needed. It can also keep a deck under the consent threshold.
Often, yes. With enough height it can be used for storage. We can add slatted screening around the base to tidy it up while still letting air through.
Any of them. Pine, kwila and composite all work on raised decks. The board choice comes down to budget, looks and how much maintenance you want.
Yes, fully insured on every job. We are happy to send the details through with your quote if you want them.
Palmerston North, Feilding and the surrounding Manawatū, including Ashhurst, Aokautere, Kelvin Grove and Hokowhitu. If you are not sure whether you are in our patch, send us the form and ask.
Yes. We pull the old deck out, cart it away and build a new one from the piles up. Removal is included in the price we quote. We focus on new builds rather than repairs, because new boards on tired framing rarely end well.
Some decks need it and plenty do not. Generally, a deck needs consent if someone could fall more than 1.5 metres from it. We will tell you where your job sits when we come out. Read the deck consent guide.
From Hokowhitu to Aokautere, out to Ashhurst, Bunnythorpe, Longburn and Linton, and across to Feilding and the wider Manawatū. We come out to quote for free.
Same day response
Get your free quote